You can watch them work here :-) http://www.tripcheck.com/popups/Cam.asp?curRegion=1&camera=1608&camera=496 On Tue, Jun 17, 2014 at 1:25 PM, Christopher Hunt <dharmachris@gmail.com> wrote:
Apparently a large cable stretching between Astoria, Oregon and Washington state (presumably the Megler bridge) was cut ~12:40am Pacific. Clink crews started splicing around 5:00am. They completed the Oregon side of the splice at 1:00pm and will be complete with the Washington side around 8:00pm local time. This has affected some, but not all, of my NW Oregon QMOE circuits. Clink group ticket #157259.
-Chris