Got a Level 3 fiber cut in San Bernardino, CA going on for about 17 hours now. Our first link alarm was at 3:47pm CT yesterday. $DAYJOB has two 1G circuits affected. Looks like they had a hell of a time getting the replacement cable and splice conduit installed. Splicing is estimated to start in another 2.5-3.5 hours on the east side of the cut. Here's the latest we received from Level 3. 10/24/2018 12:29:56 GMT - *** CASCADED EXTERNAL NOTES 24-Oct-2018 12:22:53 GMT From CASE: 15371425 - Event The Outside Plant Engineer has reported that cable preparations on both the west side and the east side of the cable is ongoing. It is estimated splicing on the west side will begin at 14:00 GMT and splicing on the east side will begin between 15:00 GMT and 16:00 GMT. 10/24/2018 11:10:34 GMT - *** CASCADED EXTERNAL NOTES 24-Oct-2018 11:04:06 GMT From CASE: 15371425 - Event The Outside Plant Engineer has confirmed the trench is dug and the replacement cable is being ran between manholes at the west side of the damage. Preparations are complete at the east side and splicing expected to begin at 11:30 GMT with the 264 count cable, then the 84 count cable followed by a 60 count lateral cable. Restoration efforts are ongoing with an ETTR that remains unchanged, 17:30 GMT. 10/24/2018 10:05:30 GMT - *** CASCADED EXTERNAL NOTES 24-Oct-2018 09:58:52 GMT From CASE: 15371425 - Event The Outside Plant Engineer reported the replacement section of cable got stuck when pulling it into position. A second splice enclosure will be installed in the next manhole. Field Operations will dig a trench between the two enclosures to complete the installation of the 2,400 foot section of 264 count replacement cable. The trench is expected to be complete at approximately 10:30 GMT with an estimated time splicing will begin of 12:30 GMT. 10/24/2018 08:08:37 GMT - *** CASCADED EXTERNAL NOTES 24-Oct-2018 08:01:50 GMT From CASE: 15371425 - Event The Outside Plant Engineer reported the replacement section of fiber cable has arrived and is currently being pulled into position. Along with the section of fiber cable, a new splice enclosure is being prepped and will be replaced to complete repairs of the 264 count cable. The 84 count cable has been prepped and ready for splicing. Field Operations have moved to an adjacent manhole looking for available slack to repair to the 168 count cable. The Outside Plant Engineer reported splicing is expected to commence at 10:00 GMT. The next update will be sent at that time or if additional information is received. -Brian

We've heard that splicing has been going on for the past several hours on the 264-count cable. Estimated time to finish that splice is 20:00 GMT. -Brian On 2018-10-24 07:43, Brian Knight via Outages wrote:
Got a Level 3 fiber cut in San Bernardino, CA going on for about 17 hours now. Our first link alarm was at 3:47pm CT yesterday. $DAYJOB has two 1G circuits affected.
Looks like they had a hell of a time getting the replacement cable and splice conduit installed. Splicing is estimated to start in another 2.5-3.5 hours on the east side of the cut.
Here's the latest we received from Level 3.
10/24/2018 12:29:56 GMT - *** CASCADED EXTERNAL NOTES 24-Oct-2018 12:22:53 GMT From CASE: 15371425 - Event The Outside Plant Engineer has reported that cable preparations on both the west side and the east side of the cable is ongoing. It is estimated splicing on the west side will begin at 14:00 GMT and splicing on the east side will begin between 15:00 GMT and 16:00 GMT.
10/24/2018 11:10:34 GMT - *** CASCADED EXTERNAL NOTES 24-Oct-2018 11:04:06 GMT From CASE: 15371425 - Event The Outside Plant Engineer has confirmed the trench is dug and the replacement cable is being ran between manholes at the west side of the damage. Preparations are complete at the east side and splicing expected to begin at 11:30 GMT with the 264 count cable, then the 84 count cable followed by a 60 count lateral cable. Restoration efforts are ongoing with an ETTR that remains unchanged, 17:30 GMT.
10/24/2018 10:05:30 GMT - *** CASCADED EXTERNAL NOTES 24-Oct-2018 09:58:52 GMT From CASE: 15371425 - Event The Outside Plant Engineer reported the replacement section of cable got stuck when pulling it into position. A second splice enclosure will be installed in the next manhole. Field Operations will dig a trench between the two enclosures to complete the installation of the 2,400 foot section of 264 count replacement cable. The trench is expected to be complete at approximately 10:30 GMT with an estimated time splicing will begin of 12:30 GMT.
10/24/2018 08:08:37 GMT - *** CASCADED EXTERNAL NOTES 24-Oct-2018 08:01:50 GMT From CASE: 15371425 - Event The Outside Plant Engineer reported the replacement section of fiber cable has arrived and is currently being pulled into position. Along with the section of fiber cable, a new splice enclosure is being prepped and will be replaced to complete repairs of the 264 count cable. The 84 count cable has been prepped and ready for splicing. Field Operations have moved to an adjacent manhole looking for available slack to repair to the 168 count cable. The Outside Plant Engineer reported splicing is expected to commence at 10:00 GMT. The next update will be sent at that time or if additional information is received.
-Brian _______________________________________________ Outages mailing list Outages@outages.org https://puck.nether.net/mailman/listinfo/outages

I am trying to get these type of outages reported on http://www.networkatlas.org for easy to visaual display Will you be able to tell me if centurylink has their kmzs available somewhere publicly? I have looked at but didn’t find it.(they have pdfs) Mehmet On Wed, Oct 24, 2018 at 11:06 AM Brian Knight via Outages < outages@outages.org> wrote:
We've heard that splicing has been going on for the past several hours on the 264-count cable. Estimated time to finish that splice is 20:00 GMT.
-Brian
On 2018-10-24 07:43, Brian Knight via Outages wrote:
Got a Level 3 fiber cut in San Bernardino, CA going on for about 17 hours now. Our first link alarm was at 3:47pm CT yesterday. $DAYJOB has two 1G circuits affected.
Looks like they had a hell of a time getting the replacement cable and splice conduit installed. Splicing is estimated to start in another 2.5-3.5 hours on the east side of the cut.
Here's the latest we received from Level 3.
10/24/2018 12:29:56 GMT - *** CASCADED EXTERNAL NOTES 24-Oct-2018 12:22:53 GMT From CASE: 15371425 - Event The Outside Plant Engineer has reported that cable preparations on both the west side and the east side of the cable is ongoing. It is estimated splicing on the west side will begin at 14:00 GMT and splicing on the east side will begin between 15:00 GMT and 16:00 GMT.
10/24/2018 11:10:34 GMT - *** CASCADED EXTERNAL NOTES 24-Oct-2018 11:04:06 GMT From CASE: 15371425 - Event The Outside Plant Engineer has confirmed the trench is dug and the replacement cable is being ran between manholes at the west side of the damage. Preparations are complete at the east side and splicing expected to begin at 11:30 GMT with the 264 count cable, then the 84 count cable followed by a 60 count lateral cable. Restoration efforts are ongoing with an ETTR that remains unchanged, 17:30 GMT.
10/24/2018 10:05:30 GMT - *** CASCADED EXTERNAL NOTES 24-Oct-2018 09:58:52 GMT From CASE: 15371425 - Event The Outside Plant Engineer reported the replacement section of cable got stuck when pulling it into position. A second splice enclosure will be installed in the next manhole. Field Operations will dig a trench between the two enclosures to complete the installation of the 2,400 foot section of 264 count replacement cable. The trench is expected to be complete at approximately 10:30 GMT with an estimated time splicing will begin of 12:30 GMT.
10/24/2018 08:08:37 GMT - *** CASCADED EXTERNAL NOTES 24-Oct-2018 08:01:50 GMT From CASE: 15371425 - Event The Outside Plant Engineer reported the replacement section of fiber cable has arrived and is currently being pulled into position. Along with the section of fiber cable, a new splice enclosure is being prepped and will be replaced to complete repairs of the 264 count cable. The 84 count cable has been prepped and ready for splicing. Field Operations have moved to an adjacent manhole looking for available slack to repair to the 168 count cable. The Outside Plant Engineer reported splicing is expected to commence at 10:00 GMT. The next update will be sent at that time or if additional information is received.
-Brian _______________________________________________ Outages mailing list Outages@outages.org https://puck.nether.net/mailman/listinfo/outages
Outages mailing list Outages@outages.org https://puck.nether.net/mailman/listinfo/outages
-- Mehmet +1-424-298-1903

This was resolved as of 6:09pm CT. Both of our links are back up and running with no further problems. -Brian On 2018-10-24 13:06, Brian Knight via Outages wrote:
We've heard that splicing has been going on for the past several hours on the 264-count cable. Estimated time to finish that splice is 20:00 GMT.
-Brian
On 2018-10-24 07:43, Brian Knight via Outages wrote:
Got a Level 3 fiber cut in San Bernardino, CA going on for about 17 hours now. Our first link alarm was at 3:47pm CT yesterday. $DAYJOB has two 1G circuits affected.
Looks like they had a hell of a time getting the replacement cable and splice conduit installed. Splicing is estimated to start in another 2.5-3.5 hours on the east side of the cut.
Here's the latest we received from Level 3.
10/24/2018 12:29:56 GMT - *** CASCADED EXTERNAL NOTES 24-Oct-2018 12:22:53 GMT From CASE: 15371425 - Event The Outside Plant Engineer has reported that cable preparations on both the west side and the east side of the cable is ongoing. It is estimated splicing on the west side will begin at 14:00 GMT and splicing on the east side will begin between 15:00 GMT and 16:00 GMT.
10/24/2018 11:10:34 GMT - *** CASCADED EXTERNAL NOTES 24-Oct-2018 11:04:06 GMT From CASE: 15371425 - Event The Outside Plant Engineer has confirmed the trench is dug and the replacement cable is being ran between manholes at the west side of the damage. Preparations are complete at the east side and splicing expected to begin at 11:30 GMT with the 264 count cable, then the 84 count cable followed by a 60 count lateral cable. Restoration efforts are ongoing with an ETTR that remains unchanged, 17:30 GMT.
10/24/2018 10:05:30 GMT - *** CASCADED EXTERNAL NOTES 24-Oct-2018 09:58:52 GMT From CASE: 15371425 - Event The Outside Plant Engineer reported the replacement section of cable got stuck when pulling it into position. A second splice enclosure will be installed in the next manhole. Field Operations will dig a trench between the two enclosures to complete the installation of the 2,400 foot section of 264 count replacement cable. The trench is expected to be complete at approximately 10:30 GMT with an estimated time splicing will begin of 12:30 GMT.
10/24/2018 08:08:37 GMT - *** CASCADED EXTERNAL NOTES 24-Oct-2018 08:01:50 GMT From CASE: 15371425 - Event The Outside Plant Engineer reported the replacement section of fiber cable has arrived and is currently being pulled into position. Along with the section of fiber cable, a new splice enclosure is being prepped and will be replaced to complete repairs of the 264 count cable. The 84 count cable has been prepped and ready for splicing. Field Operations have moved to an adjacent manhole looking for available slack to repair to the 168 count cable. The Outside Plant Engineer reported splicing is expected to commence at 10:00 GMT. The next update will be sent at that time or if additional information is received.
-Brian
participants (2)
-
Brian Knight
-
Mehmet Akcin